Ingenieur/in - Bau

Nicaragua

10-15 Jahre Erfahrung

Geburtsdatum:

Staatsangehörigkeit:
nicaraguanisch

25560261

Hochschulstudium

Zeitraum
Abschluss / Fachbereich / Hochschule
Schwerpunkte

02/199412/1998

abgeschlossen

Diplom-Ingenieur/in
Bauingenieurwesen (weiterführend)

, Nicaragua

Civil Engineering (post-graduate)

  • Dokument_Studium_011.pdf

Berufserfahrung

Zeitraum
Tätigkeit / Unternehmen
Aufgaben

08/201603/2017

Civil Engineer / "Resident of a construction site“

, Nicaragua

"Resident of a construction site“: Responsible for correct and appropriate construction of the civil works and the administrative functions of the address, as well as the control that involves checking that the work is done according to plans and specifications constructive to contribute to the objectives of the project are met, quality, time and costs. Cost of the project or $ 1,150, 000.00.

  • Dokument_Praxis_021.pdf

05/201412/2015

Civil Engineer / "Eengineer Administrative And Operation Of Project“

, Nicaragua

Management of portfolios of projects of new , , infrastructure and system projects of drinking water, financed with funds from loans from , , , .

  • Dokument_Praxis_011.pdf

07/201102/2014

Resident supervisor civil works and Electro mounting.

, Nicaragua

"Resident of a construction site“; Responsible for overseeing the correct and proper construction of civil works and administrative functions of the address, as well as the control that involves checking that the work is done according to plans and specifications constructive to contribute to the objectives of the project are met, quality, time and costs.
Supervisor Project Sub station electric 138 KV and 13 KV, .
Supervisor project , the 138KV Bay.
Supervisor project , 138KV Bay.
Support for the realization of the field study of the soil and reconsideration of the project SE of and line double-circuit 138 KV in .
Supervisor project ring of Western line double-circuit 138 KV and 69 KV, and .
Supervisor project compensation 230 kV, support Supervision compensation 230 kV, project.

  • Dokument_Praxis_031.pdf

01/200906/2011

Coordinator project rehabilitation and construction rounds short fire.

, Nicaragua

Project Coordinator, rehabilitation and construction of 837 Km of forest rounds and 7 wooden bridges in the plains of the North of , project funded by the of the Embassy of in the amount of US$ 650, 000.00.

01/200801/2009

Supervisor of projects

, Nicaragua

Responsible for overseeing the correct and proper construction of civil works and administrative functions of the address, as well as the control that involves checking that the work is done according to plans and specifications constructive to contribute to the objectives of the project are met, quality, time and costs. Project residential and , with a value of $30,000.00 to $80,000.00).

  • Dokument_Praxis_041.pdf

01/200701/2008

Supervisor of projects

, Nicaragua

Responsible for overseeing the correct and proper construction of civil works and administrative functions of the address, as well as the control that involves checking that the work is done according to plans and specifications constructive to contribute to the objectives of the project are met, quality, time and costs.
• Supervisor of the residential project, with a value of US $80,000.00 to $100,000.00.• Supervisor of the project , with a value of US $160,000.00.• Supervisor of the project , with a value of US $80,000.00 to $100,000.00.• Supervisor of the project residential , with a value of US $80,000.00 to $ 100,000.00).• Supervisor of residential project, with a value of US $50,000.00 to 80,000.00 USD).

  • Dokument_Praxis_051.pdf

01/200107/2004

Assistant of the Coordinator of the technical unit, and Assistant of technical Supervision: engineers residentsPAST - DANIDA - RAAN Bilwi, Puerto Cabezas, RACCN, Nicaragua

, Nicaragua

Administrative and technical responsibilities: Assistant of the Coordinator of the technical unit, and Assistant of technical, and Supervision of: resident engineers, supervisors and members of the technical area.Designs: sewers, vehicular bridges, Fords vehicular bridges, bridges pedestrian, piers piles and marginal, financed by the , to the municipalities of the .
Representation of the program in the municipality where he was authorized to operate (, , ...Evaluation: new projects or approved projects in implementation.Planning area of detailed budget for new projects.Support in the development of the physical-financial report of implementation projects.
Review and approval of the recruitment process.Authorization orders change, addendum, and take the Control of progress, evaluation and deductions.Participation in the visits of Supervision of implementation projects, ensuring the quality of works and giving consultancy to improve and and/or rectify errors during construction and after construction in the projects.
Review of the designs of bridges hanging hired by , () and of () in the municipality of elaborated by the independent consultant engineer .
Support to the formulation and equipment budget of the municipality of , portfolio presented to the (), for a total of C$ 58,000,000.00 (fifty million Cordobas), which was approved by ().
Support to the ( ), in the preparation of Take Off (works numbers) and budget of works, and topographic survey of paved and/or urban street paving projects.Topographical surveys, of profiles and plants, bridges, Fords.

  • Dokument_Praxis_061.pdf

Aus- und Weiterbildung

Zeitraum
Abschluss / Institut
Inhalt

Weiterbildung

02.02.200022.12.2000

abgeschlossen

Specialization course

, Nicaragua

Design and construction of vertical works (buildings, bridges, embankments, etc.)

  • Dokument_Bildung_011.pdf
  • Dokument_Bildung_012.pdf

Sprachkenntnisse

Sprache
Level
Prüfung / Zertifikat
Spanisch
Muttersprache

Englisch
Grundkenntnisse (A1)

Weitere Fähigkeiten

Kompetenzen
Führerscheine
Interessen, Hobbys, Persönliches

Responsible for overseeing the correct and proper construction of civil works and administrative functions of the address, as well as the control that involves checking that the work is done according to plans and specifications constructive to contribute to the objectives of the project are met, quality, time and costs.

  • Kraftrad
  • PKW

So geht's